Project section

Specifications

By Birla Estate · Rajarajeshwari Nagar, Bengaluru

publishedUnder construction

Build quality

Materials & services

Construction, materials, and layout-related details.

  • Doors / Windows

    Main entrance doors are crafted from engineered wood with a polished finish, ensuring durability and aesthetic appeal. Internal doors are made of solid core flush doors, providing sound insulation and privacy.

  • Doors / Windows

    Windows are designed with aluminum frames and double-glazed glass, enhancing energy efficiency and reducing outside noise.

  • Electrical

    The project includes modular switches and sockets from reputed brands, ensuring safety and ease of use. Each apartment is equipped with adequate electrical points for lighting and appliances.

  • Electrical

    The electrical wiring is done with fire-resistant cables, adhering to safety standards, and ensuring reliable power supply throughout the building.

  • Flooring

    Living areas feature vitrified tiles with a size of 600x600 mm, providing a modern and easy-to-maintain surface. Bedrooms are finished with laminated wooden flooring for added warmth and comfort.

  • Flooring

    Bathrooms are equipped with anti-skid ceramic tiles, ensuring safety and preventing slips, along with wall tiles up to a height of 7 feet.

  • Plumbing

    The plumbing system is designed with CPVC pipes for hot and cold water supply, ensuring longevity and resistance to corrosion. All fixtures are from reputed brands, ensuring quality and reliability.

  • Plumbing

    Drainage systems are designed with adequate slope and are constructed using UPVC pipes, ensuring efficient waste disposal and preventing blockages.

  • Security

    The project includes a comprehensive security system with CCTV surveillance in common areas, ensuring safety for all residents. Access control systems are installed at entry points for enhanced security.

  • Security

    Fire safety measures include smoke detectors and fire alarms in each apartment, along with fire extinguishers placed strategically throughout the building.